CONSTRUCTION - 27.02.2015

Clarification on “notifiable projects”

The Construction (Design and Management) Regulations 2015 state that a project is notifiable to the HSE if the work lasts longer than 30 days and has more than 20 workers working simultaneously at any point, or if the work exceeds 500 person days.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed bibendum, sapien nec interdum commodo, ex elit feugiat velit, vel tincidunt nibh massa nec turpis. Phasellus rutrum pulvinar tristique. Aenean vel maximus velit. Integer in purus dictum, commodo diam sed, facilisis metus. Duis sed consequat nisi. Phasellus et risus neque. Curabitur mattis, nibh ac finibus bibendum, nulla augue commodo ipsum, vitae tristique urna felis in velit. Cras et eleifend lorem, in convallis leo. Fusce id nibh et leo congue convallis. Vivamus imperdiet ipsum sit amet felis condimentum, a lobortis felis rutrum. Integer ullamcorper, turpis in aliquet tincidunt, est tellus volutpat leo, id pretium massa nibh sed orci. Pellentesque ac viverra lacus. Class aptent taciti sociosqu ad litora torquent per conubia nostra, per inceptos himenaeos. Ut ut ante eget nulla volutpat tempor. Donec commodo leo mi, congue blandit leo euismod ut.